    Following the Abbey’s dissolution in 1539, the seat of power and its bell Great Tom were transferred to Christ Church. The land gradually returned to marsh and meadow, later nicknamed “Frog Island” because of its frequent flooding. In the 19th century, Osney Island was developed for housing linked to Oxford’s expanding railway economy, bringing new energy and activity to the area.

  • A river island with ancient roots

    The name “Osney” may stem from “Osa’s Island” or the ancient British word for river, “Ouse” — fitting for a site shaped by water for centuries. In the 12th century, it became home to Oseney Abbey, one of Oxford’s most powerful religious institutions.

  • Lighting Oxford

    When it opened in 1892, Osney Power Station supplied electricity for Oxford’s trams and early street lighting. It was part of a wave of municipal infrastructure that helped modernise the city

Breathing new life into Osney Power Station

The Business School’s residential courses are currently run from a respected but remote 1960s facility that no longer meets its ambition.

The redevelopment of Osney Power Station – a landmark Victorian building that’s listed on the City Council’s Heritage Register – will change that. Alongside a top-quality team, we’re delivering a space that respects the site’s industrial past while creating flexible, future-focused environments. This includes modular teaching spaces, an ‘agora-style’ hub, AV/IT suites, leisure facilities and over 120 en-suite bedrooms.

Our delivery

Delivering quality is a key focus and essential to a project that has spanned eight years.

From enhanced inspections to smart use of technology, the team has enforced rigorous and consistent standards across every phase.This is a building designed to last, with durable, high-spec finishes in critical areas such as mechanical services, façades and infrastructure.

We have delivered:

  • OpenSpace 360°
  • Digital dashboards
  • Building Information
  • Modelling services
Delivering lasting impact

Despite multiple challenges, the project achieves the client’s aspiration set out at the start of the contract and remains on budget and on track for completion by spring 2026.

Through close collaboration, bold solutions and an unwavering commitment to quality, our teams are proud to have helped shape a defining new chapter for this landmark.

 

Built on heritage

  • Industrial
    identity

    The design champions Osney Power Station's industrial identity. It retains three original facades, exposed brickwork, a crane and 14 steel windows from the 1920s.

  • Exceeding
    expectations

    The structure’s design reflects the steel frame added in the 1950s, blending its heritage with contemporary use. We have exceeded the building’s ‘semi-listed’ expectations every step of the way.

  • Protecting
    integrity

    We worked closely with conservation officers, many stakeholders and the local community to protect the integrity of this important Oxford landmark.

The redevelopment of Osney Power Station overlooking the River Thames in Oxford isn't without its challenges.

From safeguarding its historic character to navigating environmental risks and tight logistics, this ambitious project has pushed the boundaries of innovation. Project managed by our team in Oxford, our client came to us with big goals, a long-term vision and complex challenges. We have helped to shape those into something achievable, practical and valuable.

The redevelopment of Osney Power Station overlooking the River Thames in Oxford isn’t without its challenges. From safeguarding its historic character to navigating environmental risks and tight logistics, this ambitious project has pushed the boundaries of innovation. Project managed by our team in Oxford, our client came to us with big goals, a long-term vision and complex challenges. We have helped to shape those into something achievable, practical and valuable.

  • Heritage meets precision

    The power station is locally listed and sits beside a conservation area, so preserving its key architectural features — such as the historic façades and original windows — is essential. Add in Oxford’s strict Carfax height rule, and the project has demanded precision at every turn.

  • Building against the tide

    On the banks of the Thames, the Osney site faces serious flood risks. To future-proof the building, it needed a design capable of withstanding an exceptional flood. This meant raising key elements above predicted levels and installing flood barriers. Repairs below the water line to the river wall required precision work within a tight winter window. We oversaw the installation of a 120-metre-long coffer dam which exposed the brickwork, creating a safe, dry working environment.

  • Secrets of the site

    Given the site’s historic past, it was unsurprising that an archaeological dig uncovered medieval remains, such as a dovecot that had links to a former monastery. The development’s design was adapted to protect these finds. Part of the site was originally home to collections from the University Museum that comprised hazardous historical artefacts. Specialist removal companies were needed to relocate these displays before construction could continue. Among the museum’s stored items were explosive whaling spears and poison-tipped arrows, requiring bomb disposal experts

Navigating heritage, hazards and history

  1. Unexpected ground conditions

    We uncovered solid concrete foundations extending over seven metres deep, demanding meticulous planning and engineering. This significantly increased the requirement for excavation and added to the complexity of an already challenging groundwork phase.

  2. Building in tight spaces

    A tight site demands creative logistics, and in this case resulted in off-site material storage and carefully timed deliveries to avoid congestion. Meanwhile, installing the steel frame was a major task that extended over 14 months as we incorporated modern fire safety measures into the structure.

  3. Shadows and sightlines

    The development increases the building mass, subsequently triggering detailed right-to-light assessments to ensure neighbouring properties weren’t adversely impacted.

  4. Uncovering hidden hazards

    Extensive investigations uncovered hidden hazards, including asbestos and lead paint, some buried deep underground. Meticulous remediation was essential to protect the construction teams and ensure a safe environment for future occupants.

  5. Listening to the locals

    With homes nine metres away, we made communication a priority. Four rounds of public consultation shaped the planning stage, while regular newsletters and face-to-face updates continued to keep residents informed and involved throughout the project.

  • Redefining sustainable heritage

    Sustainability has been a core ambition from the outset of this complex Thames-side project in the centre of Oxford. Originally designed with a gas boiler, the building will now run 100% on electricity and is targeting zero carbon in use.

    To meet strict planning requirements, heating and cooling are delivered via an
    air source heat pump, hidden beneath
    a removable section of roof.

  • Smart systems, long-term efficiency

    To promote the aim for a zero-carbon operation, the building features smart systems throughout to help optimise energy use without compromising user experience.  Though full Passivhaus certification isn’t feasible in a retrofit
    of this scale, airtightness and thermal performance exceed typical standards
    and set a new benchmark for projects
    of this kind.

  • Built for durability

    Long-term performance is a key design focus. Durable, low-maintenance materials have been used everywhere, particularly in mechanical systems, façades and building infrastructure. Enhanced inspection regimes and digital tools, including 360° site photography
    and real-time dashboards, have helped
    us ensure quality is embedded at
    every stage.

A legacy of integration

  • This project is more than environmentally sustainable — it also supports social and academic sustainability. By bringing more opportunities for executive education into the heart of Oxford, this pioneering redevelopment deepens the school’s connection with both the wider university and the city. It transforms an underused site into a vibrant learning environment with enduring civic and educational value.