RIBA Plan of Work
Ridge Lines
The RIBA Plan of Work is one of the most widely used frameworks in the UK construction industry and frequently sits at the heart of disputes concerning design development, scope of services, responsibility, programme, procurement and project delivery. Issues such as whether a consultant fulfilled their obligations, whether information was provided at the appropriate stage, or whether a design risk should have been identified earlier in the process often require a detailed understanding of how a project is intended to progress through the recognised RIBA stages. Consequently, the Plan of Work is regularly referenced in appointments, fee proposals, design responsibility matrices and expert evidence.
This overview explains the origins and purpose of the Plan, the key project stages, the documents that support it, and the role it plays in coordinating design and construction activities. Understanding this framework can assist lawyers in interpreting project records, identifying departures from accepted industry practice, assessing causation, and evaluating the significance of decisions made at different stages of a project’s development.
The RIBA Plan of Work
Overview
The Royal Institute of British Architects (RIBA) is one of the key Institutions in the UK construction industry, along with the Institution of Structural Engineers (IStructE). Together they have provided a suite of documents that helps consultants to define the key project stages and deliverables associated with each of those stages. This has become one of the fundamental building blocks of how projects are defined, in terms of fees, programme, and information to be provided. Whilst the plan forms the basis of many contracts, it is not intended to be a contractual document, simply a guidance document to facilitate the design process.
Background
Design of any development is a complex process and yet, many countries have no formal guidance to help navigate the process. In the UK, RIBA first established its Plan of Work in 1963. The plan set out standard stages and deliverables that apply to most conventional projects. It also reflected the requirements of parallel processes such as planning, tendering, and procuring.
Recent years have seen new challenges, such as sustainable design, BIM, changing procurement strategy, greater use of Design for Manufacture and Assembly (DfMA), and an increasing reliance on specialist subcontractors. The 2020 update to the Plan of Work sought to reflect these changes. However, the Building Safety Act from 2022 is a significant recent change which is not yet reflected within the Plan of Work.
As part of a coordinated effort, in 2020 the IStructE published a complementary plan for structural engineers, reflecting the structural aspects at each stage of the project. The RIBA Plan of Work has now become the default roadmap for most construction projects in the UK.
Core activities
The core tasks for most construction projects are broadly similar and typically include the following:
- Agree appointments with the professional team
- Develop a brief with the client
- Create concept designs options
- Coordinate the design
- Prepare a planning application
- Apply for planning consent
- Develop a set of construction information
- Prepare a tender
- Obtain consents required prior to construction
- Award a building contract
- Construct the building
- Inspect the construction as it progresses
- Hand over the building
Key documents
In addition to the overarching template that defines the Plan of Work, the suite also includes a design responsibility matrix (DRM) in spreadsheet format and an overview and guidance document. Online resources are also available, such as overlay guidance for particular areas including security, DfMA, Passivhaus, inclusive design, engagement, and Smart buildings. The DRM sets out all of the anticipated design packages, along with the parties responsible, the ‘Level of Detail’, and the ‘Level of Information’ anticipated at each work stage. Whilst a useful starting point to define responsibilities at the start of the project, the DRM is often superseded by a client or contractor version later in the project.
Work stages
The Plan of Work has eight conceptual project stages, which are designed to set out a road map for a project. The plan can be used by a client to set up the project, or by a project team member as a point of reference to gauge deliverables at each stage. These work stages are shown below, along with the expected outcome, core tasks, statutory processes, procurement route, and information exchanges. (See RIBA Plan of Work for more detail).

In practical terms, most projects will run from Stage 1 through to Stage 6, hence Stage 7 ‘In Use’ is omitted in the diagram. Large projects may include a Stage 0, which is intended to define high-level strategic requirements such as business case, project risks, and budget.
- Stage 1 requires the preparation of the project brief, programme, expected outcomes, site data and often includes site surveys.
- Stage 2 marks the start of concept design, optioneering design solutions, and cost and programme comparisons. After a favoured option is identified, the design process moves on to spatial coordination.
- Stage 3 provides a more developed design of the preferred option along with updated cost plan and programme. Most often at this stage, a planning application is submitted based on Stage 3 information, although this can occasionally happen in Stage 2 or 4.
- Stage 4 is where detailed design is completed and coordinated after a successful planning approval. This stage is sometimes split into Stage 4a and 4b where procurement falls in the middle of the stage. Stage 4a covers the detailed design before procurement. Stage 4b typically involves a favoured main contractor appointed under a Pre-Contract Services Agreement (PCSA), inputting alongside the design team to finalise the design to a construction level of detail for early packages. The detailed design is honed to a construction level of detail, often incorporating the design input from various specialist subcontractors.
- Stage 5 marks the commencement of site works. The design team may be novated to the main contractor, or alternatively a new design team may be brought in by the contractor. In either case, the final elements of construction design are finalised for later packages, and the emphasis shifts towards site inspections, quality control, and resolving queries. Novation can also happen at Stage 3 or 4 although this is less common.
- Stage 6 represents project completion and handover and allows for seasonal commissioning, defect remediation, and post occupancy evaluation.
The plan acknowledges that tasks undertaken during any stage might have an impact on the performance of the building. For this reason, Stage 7 reflects the activities carried out after the handover of the building and well into a building’s life, even though construction on most projects will have concluded at the end of Stage 6.
Procurement
The procurement strategy is a critical part of any project, which fundamentally impacts how the project is set up as well as the outcome. The Plan of Work is procurement neutral, reflecting the variety of procurement routes used in the current market. However, the choice of procurement type can have a major impact on project programme, contractual risk, whether the design team is novated, information to be provided, etc. The procurement route will often impact on the Plan of Work particularly if the procurement route is finalised during Stages 1 and 2, in which case the Plan of Work must be altered to suit procurement.
The most common forms of procurement considered within the plan include Design and Build (single stage and two stage), Traditional and Management Contracting. However, it is fair to say the complexities of procurement do not always fit neatly within the Plan of Work. For example, whilst novation of Architects and Structural Engineers to the Main Contractor is common, it is less common for MEP consultants to be novated and they are often replaced by the MEP sub-contractor for Stages 4 and 5. This can lead to MEP design changes late in the project, which in turn can lead to numerous late coordination changes with the other disciplines during Stage 5.
Structural Plan of Work
The IStructE Structural Plan of Work 2020 (Guidance to structural plan of work) was developed to coordinate and integrate with the RIBA Plan of Work 2020, providing a complementary framework for structural engineers. As such, it follows the same work stages as the RIBA plan but describes purely structural deliverables at each stage. The suite of documents includes the Structural Plan of Work template, a DRM, a Structural Sustainability template, and a guidance document for the entire plan.
One difference in terminology is that instead of Stage 4a and 4b, the Structural Plan of Work uses Stage 4 and 4.5. However, the intent is broadly similar, with the Stage 4.5 sub-stage being intended to capture the production of construction information including specialist subcontractor design as well as outputting the construction information required for Stage 5.
Another notable difference in the Structural Plan is the inclusion of design contingency figures for each stage, e.g. 10-15% contingency for Stage 3, 5-10% for Stage 4, 2-5% for Stage 4.5, etc.
BSRIA BG6
The ‘Building Services Research and Intelligence Association’ (BSRIA) publishes similar guidance on project work stages called ‘BG6 A Design Framework for Building Services’, 5th edition. This defines the MEP activities, information and level of detail required for each stage of a project. Although it is aligned with the earlier 2013 version of the RIBA plan, the differences are minor. This gives similar cost estimation guidance to the design contingencies in the IStructE plan, but assumes +/- 25% for Stage 2, +/- 15% for Stage 3 and +/- 5% for Stage 4.
Services
Strong individual services that outperform when connected – shaped by what each project needs. We bring the right expertise at the right time to deliver better outcomes.
-
Planning and advisory
-
Design and engineering
-
Management