03 Overcoming the challenges
Navigating heritage, hazards and history
The redevelopment of Osney Power Station overlooking the River Thames in Oxford isn’t without its challenges. From safeguarding its historic character to navigating environmental risks and tight logistics, this ambitious project has pushed the boundaries of innovation.
Project managed by our team in Oxford, our client came to us with big goals, a long-term vision and complex challenges. We have helped to shape those into something achievable, practical and valuable.
Heritage meets precision
The power station is locally listed and sits beside a conservation area, so preserving its key architectural features — such as the historic façades and original windows — is essential. Add in Oxford’s strict Carfax height rule, and the project has demanded precision at every turn.
The Carafax Tower
The 23m Carafax Tower, originally part of a 12th century church in Oxford, sets regulations that limit the height of new developments in the city centre to 18.2 meters (60 feet). This preserves the views of the city’s historic skyline and protects key landmarks like spires of the university colleges and other significant historical buildings. These were all considerations for Osney Power Station.
This building will be a lot more than just bricks and mortar. It will continue Oxford's tradition of inspiring and bringing fresh perspectives to international challenges and opportunities.”
Eleanor Murphy
Associate Dean for Executive Education, Saiid Business School
Building against the tide
On the banks of the Thames, the Osney site faces serious flood risks. To future-proof the building, it needed a design capable of withstanding an exceptional flood. This meant raising key elements above predicted levels and installing flood barriers. Repairs below the water line to the river wall required precision work within a tight winter window. We oversaw the installation of a 120-metre-long coffer dam which exposed the brickwork, creating a safe, dry working environment.
Secrets of the site
Given the site’s historic past, it was unsurprising that an archaeological dig uncovered medieval remains, such as a dovecot that had links to a former monastery. The development’s design was adapted to protect these finds.
Part of the site was originally home to collections from the University Museum that comprised hazardous historical artefacts. Specialist removal companies were needed to relocate these displays before construction could continue.
Among the museum’s stored items were explosive whaling spears and poison-tipped arrows, requiring bomb disposal experts.
-
Unexpected ground conditions
We uncovered solid concrete foundations extending over seven metres deep, demanding meticulous planning and engineering. This significantly increased the requirement for excavation and added to the complexity of an already challenging groundwork phase.
-
Building in tight spaces
A tight site demands creative logistics, and in this case resulted in off-site material storage and carefully timed deliveries to avoid congestion. Meanwhile, installing the steel frame was a major task that extended over 14 months as we incorporated modern fire safety measures into the structure.
-
Shadows and sightlines
The development increases the building mass, subsequently triggering detailed right-to-light assessments to ensure neighbouring properties weren’t adversely impacted.
-
Uncovering hidden hazards
Extensive investigations uncovered hidden hazards, including asbestos and lead paint, some buried deep underground. Meticulous remediation was essential to protect the construction teams and ensure a safe environment for future occupants.
-
Listening to locals
With homes nine metres away, we made communication a priority. Four rounds of public consultation shaped the planning stage, while regular newsletters and face-to-face updates continued to keep residents informed and involved throughout the project.